RSS

Cahaba Beach Road

IMG_4022.jpg

Neal Embry

The resolution addressed the controversial road project, which would connect U.S. 280 to Sicard Hollow Road by connecting the latter to Cahaba Beach Road. Read more

News 3 Comments

STA_9148_1.jpg

Neal Embry

Opponents say there is not enough being done to address potential negative impacts on Birmingham-area drinking water. Read more

News 1 Comments

VV-COVER-YIP-InfrastructureCones.jpg

Photo by Emily Featherston.

From debates on the location of new restaurants to the overhaul of the city’s recreation facilities, one thread can be found weaving its way through nearly every single public meeting held over the last year: infrastructure issues. Read more

News

Screen Shot 2017-11-20 at 9.42.15 PM.png

Emily Featherston

Several of the city's major road projects were discussed at length. Read more

News

DSC_1782.JPG

Sydney Cromwell

The road would connect Cahaba Beach Road at Swan Drive to Sicard Hollow Road. Read more

News

280 CITY Roads Followup1.JPG

Photo by Sydney Cromwell.

Two years after being approved by the city of Birmingham, a feasibility study on using Grants Mill Road to relieve congestion on U.S. 280 looks ready to begin later this year. Read more

News 1 Comments

Cahaba Beach Road project

Sydney Cromwell

The second meeting will be Thursday from 5 to 7 p.m. at First Christian Church, 4954 Valleydale Road. Read more

News

  • STA_9148_1.jpg

    Neal Embry

    A representative with ALDOT explains the proposal to reconnect Cahaba Beach Road with Sicard Hollow Road to residents at a public input meeting on Aug. 7

  • STA_9154_1.jpg

    Neal Embry

    This map shows the two options being advanced by ALDOT to reconnect Cahaba Beach Road and Sicard Hollow Road. Options 5 and 5B are being advanced.

Subscribe to our daily newsletter

* indicates required
Vestavia Voice